Skip to content

Partitions & showers · Made in Dallas

Steel partitions and shower enclosures.

Room dividers and shower enclosures in slim steel and glass, drawn around your space.

Quoted per room Typical investment

Specifying for a client? Start a trade project

Arched shower enclosure; guest bath
Approved shop drawing · Shower door, sidelite and transom · 130 × 117½ in
The approved shop drawing of the same shower assembly: door, sidelite and transom, with dimensions

Drawn, then built

A shower wall, drawn as one assembly.

A door, a fixed sidelite and a transom across a marble wet room. The drawing fixed every lite and the swing of the door; the enclosure was made to it.

Send your elevations
Corner black steel and clear glass shower enclosure in a pale marble primary bath
As built · the same enclosure

For architects, designers and builders

Specify the partitions with us.

Shop drawings for your set, pricing by opening, and a private showroom visit with your client.

Start a trade project

Decide early

Passage
Door width, swing and the furniture around it.
Privacy
What stays visible between the rooms, and what does not.
Wet rooms
Tile layout, floor levels and the waterproofing plan.

What we provide

Assemblies
Doors, fixed panels, transoms and sidelites in one frame.
Glass
Safety glazing for showers per 16 CFR 1201, confirmed with your team and supplier.
Measure
Taken after the stone, curb and ceiling are finished.
Coordination
Blocking, waterproofing and attachment with your builder.
Doors
Pivot, hinged or sliding; swing and clearance set on the drawings.
Finish
Matched to the room’s hardware; samples at the showroom. Materials and finishes
Shop drawings
Drawn against your elevations and approved before fabrication.
Fabrication
Made in our Dallas shop. Fabrication is typically 8–12 weeks after drawing approval.
Setting
Set in place by our own crew.

Exact sightlines and sections are set on your shop drawings.

The trade desk

Selected project teams

All 30 project teams
  • StreetLights Residential
  • Trammell Crow Company
  • Waldrop + Nichols Studio
  • Shaddock Custom
  • Park Interiors
  • Haley Lane Interiors

Typical investment

Every room, drawn and quoted.

Partitions & enclosures
Quoted per room from your plans or photos
Multi-room projects
$20k–$65k
Residence projects
$60k–$250k+

Every project is drawn and quoted for its openings; size, glass, finish, hardware and site conditions set the final investment.

Several pieces, or the whole house

The bath, the dressing room and the hall between.

Partitions and showers drawn with the interior doors are quoted as one project.

Questions

Partition and shower questions.

“It was a pleasure working with D'Hierro. Impeccable work, craftsmanship and customer service.”

Cecilia T. · Google

5.0 stars on Google · Best of Houzz Service 2013–2017 · Read every review

Are partitions structural?

They can be free-standing dividers or full-height framed walls; we engineer the steel to the span and anchoring the space needs.

Can a partition include a door?

Single or double steel doors are detailed into the partition so the opening and the wall read as one continuous piece.

What glass options are there?

Clear, reeded, smoked, and switchable smart glass — chosen for how much you want to see through and how much privacy you need.

What do you need to start a steel shower enclosure?

The bathroom plan or a few photos, the approximate enclosure size, where the door should be and how it should swing, and any inspiration. Final stone dimensions and a glass specification can follow; we tell you which decisions matter now and which wait for the field survey.

When is a steel shower enclosure measured?

After the stone, tile, curb and ceiling are finished. Final frame and glass sizes come from a field survey of stable surfaces. Before then we coordinate blocking, waterproofing and attachment zones with your builder, because a late stone cap or floor change moves the door clearance and the glass sizes.

What glass does a steel shower enclosure use?

Safety glass. Federal rules (16 CFR Part 1201) and the building code require safety glazing in shower doors and enclosures. The project team and glass supplier confirm the compliant type and thickness, and we coordinate the steel stops, edges and hardware cutouts to that make-up before the glass is made.

Plan your partition

Tell us about the room.

Rocio and Jorge Perez, the founders of D’Hierro
Rocio and Jorge Perez read every project. Prefer to talk? (972) 943-9924

Step 1 of 2

Who you are
What are you planning?

Kept private. For a lot, the subdivision and ZIP are enough.

No obligation. A reply within one business day.

What happens next

  1. We look at the room. Plans, photos or rough sizes are enough. Your architect, designer or builder is welcome on the thread.
  2. A direction and a budget range. Drawn for your house, then talked through at the showroom, on site or by video.
  3. Then the shop drawings. Every dimension on paper for you to sign before any steel is cut.

Private Showroom Appointment

Come see the work.

Designers: bring your client, and we set out the finishes for the project. By appointment, Monday–Friday.

The showroom

14060 Proton Road, Suite 250
Dallas, Texas 75244

Open by appointment · Monday–Friday

(972) 943-9924

For the trade

Specifying for a client? Send drawings or photos; no client address needed.

Start a trade project