Drawing to installation

One shop.
Seven clear steps.

One accountable Dallas team carries the work from the first opening to the final field adjustment.

CustomDrawn for the opening
8–12 weeksTypical fabrication after approval
Usually one dayMost local installations
What to expect

The path stays visible.

Each approval closes a decision before the next stage begins. That keeps design, fabrication, and installation aligned.

Open the planning checklist
  1. Share the opening

    A plan, elevation, photograph, sketch, or approximate dimension is enough to begin.

  2. Confirm the scope

    We clarify operation, quantity, site conditions, glass, hardware, finish, delivery, and installation.

  3. Develop the drawing

    Shop drawings resolve proportions, structure, hardware zones, glazing, and the conditions around the opening.

  4. Final confirmation & scheduling

    The final drawing, finish sample, glass, hardware, scope, and schedule are confirmed before fabrication.

  5. Forge it in Dallas

    Our shop fabricates the piece, checks the geometry, prepares the finish, and coordinates glazing and hardware.

  6. Quality check

    The work is reviewed against the approved package before it leaves the studio.

  7. Install and adjust

    Our crew coordinates delivery, installation, glazing, hardware, protection, and the final field adjustment.

Before fabrication

The important decisions are already on paper.

Verified opening Approved shop drawing Glass specification Hardware selection Finish approval Installation scope